I took a moment on the way to work to stop and get a good look and picture (see below) of the Joshua Chamberlain Bridge railing that is getting a makeover with some sand blasting and paint.

It's great that these much needed things are getting some attention. Also, to finish the job the work crew has given us a heads up that the bridge will be reduced to one lane starting on Wednesday, June 12.

The finished job will look fantastic.

 

Photo by, Nelson Jewell